After the Mining generator starts, system maintenance is important to ensure operational longevity. The following are the precautions after the use of Mining generator for users' reference.
Residual Energy Discharge
Verify all capacitors within the Mining generator is fully drained using the integrated voltmeter. Residual energy accumulation poses electrocution risks during maintenance.
Cooling Phase Management of Mining generator
Allow the Mining generator to complete its automatic cooldown cycle (typically 15-30 minutes) before powering off. Forced shutdowns during high-temperature states may damage superconducting components.
Vibration Inspection of Mining generator
Conduct a manual check on mounting bolts and chassis joints. Persistent vibration from the Mining generator during operation may loosen structural fittings over time.
Filter Replacement Schedule
Replace particulate filters every 200 operational hours. Clogged filters reduce the Mining generator airflow efficiency by up to 40%, triggering overheating alarms.
Software Log Review
Export and archive diagnostic logs generated by the Mining generator onboard computer. Irregular patterns in torque curves or RPM fluctuations often precede mechanical failures.
Always store the Mining generator in climate-controlled environments when idle. Moisture condensation corrodes its magnetic coils within 72 hours of inactivity.
More information about Mining generator:https://fadianjipower.com/