Before starting the mobile generator set, some preparatory measures need to be taken to ensure safe and efficient operation. These compact yet powerful devices require attention in three key areas before commissioning. The following is provided for the user's reference.
1. Visual Inspection for mobile generator set
Conduct a 360-degree examination of the mobile generator set, checking for oil/fuel leaks, loose bolts, or damaged cables. Verify the integrity of exterior components including cooling fins, exhaust pipes, and control panel covers. Pay special attention to the trailer-mounted models' tire pressure and hitch mechanisms if applicable.
2. Fluid & Fuel Systems
Confirm adequate levels of engine oil, coolant, and diesel in the mobile generator set. For units stored over 30 days, test fuel quality and drain water from sediment bowls. Inspect battery terminals for corrosion while ensuring electrolyte levels (for non-sealed types) meet manufacturer specifications.
3. Run preparation for mobile generator set
Position the mobile generator set on stable ground with 1-meter clearance from combustibles. Disconnect all load cables initially, then prime the fuel system according to the manual's bleeding procedure. Finally, validate emergency stop functionality and ensure all personnel are clear of rotating parts before attempting ignition.
Adhering to this protocol significantly enhances the mobile generator set service life while minimizing unexpected downtime. Always consult the equipment-specific manual for brand-dependent variations in pre-start requirements.